Non-load-bearing interior partitions typically use 25-20 gauge steel studs, while load-bearing and structural framing calls for 18 gauge or heavier. Fire-rated wall assemblies have to match a tested UL or GA-600 design number exactly — stud spacing, gauge, and gypsum layers all have to line up with the listed assembly, or the rating doesn’t hold. Commercial framing in Arvada spans everything from historic-sensitive work in Olde Town’s brick buildings to new construction-adjacent framing out in Candelas — different structural considerations for each.
Non-structural framing follows ASTM C645 and structural cold-formed steel framing follows ASTM C955; fire-rated assembly requirements are governed by Arvada’s adopted 2024 International Codes, following the city’s 2026 move off its prior 2018 code cycle — we confirm the exact edition in effect before finalizing assembly designs, since several metro jurisdictions are mid-transition in 2026. Framing on a mid-size commercial project typically runs 3 to 6 weeks on-site.
We cover 80001 through 80007, including Olde Town Arvada, West Arvada, and the newer Candelas/West Woods growth corridor. Permits go through the City of Arvada Building Division. Olde Town Arvada’s commercial buildings sit within a National Register Historic District dating to the 1880s, which can mean extra care with materials and approvals on projects there.
Steel Bridge Construction handles steel stud framing projects throughout Arvada and the surrounding Denver metro.
Get a Free EstimateThe most common failure point is MEP coordination — ducts, conduit, and plumbing cut through rated walls without proper fire-caulking or putty pads, which fails inspection and means rework.
Send us your project address, photos, or plans and we will put together a detailed estimate.
Get a Free EstimateYes — steel stud framing is one of our core services in Arvada, covering Olde Town Arvada, West Arvada, and the newer Candelas/West Woods growth corridor.
Permits go through the City of Arvada Building Division. We manage the application and inspection process as part of the project.
Framing on a mid-size commercial project typically runs 3 to 6 weeks on-site.
We match stud gauge, spacing, and gypsum layers exactly to a tested UL or GA-600 assembly number, and coordinate with MEP trades in advance so ducts, conduit, and plumbing don’t compromise a rated wall after the fact.