Steel stud framing in Aurora covers two very different kinds of commercial work: fire-rated partition framing inside occupied medical and office buildings around the Anschutz Medical Campus, and interior framing for new retail and mixed-use tenant space as the city’s business districts keep expanding. Non-load-bearing partitions typically use 25-20 gauge steel studs; load-bearing and structural framing calls for 18 gauge or heavier. Every fire-rated wall assembly has to match a tested UL or GA-600 design number exactly — stud spacing, gauge, and gypsum layer count all have to line up with the listed assembly for the rating to hold up under inspection.
A meaningful share of Aurora’s commercial framing work concentrates around a handful of named districts rather than being spread evenly across the city. The Anschutz Medical Campus and the surrounding Fitzsimons redevelopment continue to add medical office and lab space that needs fire-rated partition work built to hospital-grade standards. West of there, the Stanley Marketplace — a 200,000-plus-square-foot adaptive reuse of the former Stanley Aviation manufacturing plant into a mixed-use dining, retail, and office destination — represents a different category of framing project entirely: existing industrial bones, non-standard ceiling heights, and phased tenant buildouts that don’t follow a standard tenant-improvement playbook. Closer to Aurora’s municipal center, commercial buildings inside the City Center Urban Renewal Area along the Alameda Avenue corridor are older properties that increasingly need interior reframing as they turn over to new tenants.
Aurora has adopted the 2021 International Building Code family (IBC, IMC, IPC, IECC) along with the 2023 National Electrical Code, with local amendments recorded in Aurora City Code Chapter 22. Non-structural framing follows ASTM C645, and structural cold-formed steel framing follows ASTM C955. Commercial plan review runs through the city’s online Building Division portal, part of the Aurora4Biz business-services hub; review timelines vary with project complexity, and it’s common for a commercial submission to go through more than one correction cycle before approval — something we build into the schedule as a planning assumption rather than a surprise. Framing on a mid-size commercial project typically runs 3 to 6 weeks on-site once permitted.
The most common failure point on Aurora framing jobs is MEP coordination inside rated assemblies — ducts, conduit, or plumbing lines cut through a fire-rated wall without proper fire-caulking or putty pads, which fails inspection and forces rework. On adaptive-reuse projects inside older industrial or big-box shells, a second wrinkle shows up often: confirming what’s actually holding up the roof before framing new interior walls against it, since as-built drawings for Aurora’s older commercial buildings don’t always match field conditions.
We serve Aurora’s full commercial framing market — ZIP codes 80010 through 80019 — from the Anschutz Medical Campus and Stanley Marketplace near the Denver line, through the City Center corridor, out to the business parks developing alongside Southlands, Sky Ranch, and The Aurora Highlands, the roughly 5,000-acre master-planned community taking shape near Denver International Airport with long-term plans for tens of thousands of new homes and the commercial space that follows them.
Yes — steel stud framing is one of our core commercial services in Aurora, covering everything from medical office buildouts near Anschutz to retail framing in redeveloped spaces like Stanley Marketplace.
Permits run through the City of Aurora Building Division’s online plan review portal. We manage the application and inspection process as part of the project.
Framing on a mid-size commercial project in Aurora typically runs 3 to 6 weeks on-site once permitted, though adaptive-reuse and existing-building projects can take longer to scope accurately.
We match stud gauge, spacing, and gypsum layers exactly to a tested UL or GA-600 assembly number, and coordinate with MEP trades in advance so ducts, conduit, and plumbing don’t compromise a rated wall after the fact.
Yes — buildings like Stanley Marketplace come with existing structural conditions that don’t always match older drawings, so we verify field conditions before framing new interior walls against the existing structure.